Client: Mills Peninsula Health Services Design Team Leader: Charles Pankow, Inc.
TEC was on the design team for this Office of Statewide Health Planning and Development (OSHPD) project at Mills Peninsula in San Mateo. Additionally, TEC removed and replaced the backup generator, and designed and is currently installing the fuel system to power it.
|
|
Emoryville, CA Contractor: WL Butler Client: AC Transit
TEC installed fuel process piping for a hydrogen fueling station in Emoryville, California. AC Transit currently has 7 hydrogen-fueled buses in their fleet - they required hydrogen fuel dispensers to service these vehicles, as well as one additional dispenser for public use.
The alternative fueling facility included a 9,000 gal aboveground storage tank, compressor, and a drier. The piping was designed and constructed to withstand pressures up to 13,000 pounds per square inch!
|
|
San Bruno Fire Station
TEC provided Design/Bid/Build for the City of San Bruno Fire Station. After designing a 4,000-gal aboveground storage tank (AST) system and associated piping, TEC was awarded the contract to construct the system according to their design specifications. TEC removed a prexisting 4,000-gal diesel underground storage tank (UST) and installed the diesel AST with connections to 3 emergency generators that power city hall and the fire station in case of power failure. TEC also served as the environmental consultant and regulatory liaison for related UST environmental casework.
|
|
|
|
|
|
|