|
TEC has acted as General Contractor on tenant improvement projects for private and public owners. TEC estimates, schedules and coordinates the work, and provides overall project management. Tenant improvement work includes demolition, rough and finish carpentry, mechanical, electrical, finishes, voice and data cabling, and digital video security.
|
|
The correct installation of fuel tanks is the best way to avoid costly repairs in the future.
TEC offers comprehensive tank system installation including design, permitting, agency interface, and construction. We install fuel tanks for emergency generators and build high volume fueling facilties with over 1 million gallons throughput per month.
Our tank removal services include permitting, regulatory liaison, removal and disposal of tank systems, backfilling, resurfacing, documentation, reporting, and follow-up with soil and groundwater remediation if needed. TEC can provide all services for your tank installation or removal from start to closure.
|
|
|
We expanded our construction division to include seismic retrofitting of buildings for risk management and financial gain. As building codes have changed over the years by increasing design criteria to withstand future seismic events, TEC has adopted a retrofit program to help our clients upgrade their real estate portfolios. We perform cost analysis of the designs to assure that the client's expectations are met. We have worked with the latest hardware that exceeds the current building codes.
|
|
TEC Accutite builds petroleum fueling facilities from the ground up. With our extensive knowledge of fuel tank and line installation, regulatory requirements, and monitoring systems, TEC constructs state-of-the-art, safe facilities. We combine our expertise in the design and construction of fueling facilities with knowledge of seismic engineering to serve our clients. TEC builds fueling systems designed to allow for differential ground movement and settlement.Â
Our knowledge stems from hands-on repairs to fueling systems damaged during the 1989 Loma-Prietta earthquake, and from extensive testing under SB 989. The experience gained from the analysis of the failure modes, from these events allows our project managers and field crews to provide sound value engineering during the construction or retrofit phase of a project.
|
|
|
|
|
|