You are here: Home Our Services Environmental Services
Environmental Services
Phase I Environmental Assessments

The Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) imposes liability on owners, operators, and other potential responsible parties (PRPs) for property on which hazardous materials or wastes are located. To assess, eliminate or reduce this liability, TEC Accutite's staff of Registered Engineers, Geologists, and Hydro-Geologists perform Phase I Environmental Site Assessments on commercial and industrial properties.

 
Phase III Remediation Services

Our staff has extensive experience in developing and implementing pragmatic remedial programs (Phase III) that effectively meet the needs of each client while satisfying the State Water Quality Control Board, local agency requirements, and the guidelines of the State Clean-up Fund.

Characterization and remediation services offered by TEC:

    • Pilot testing
    • Aquifer pump testing
    • Dual Phase extracting
    • Soil vapor extracting and air sparging
    • Groundwater pump and treatment
    • Bio-remediation
    • Monitoring for natural attenuation
 
Risk-Based Corrective Action

RBCA is a consistent decision-making process for the assessment and response to a chemical release, based on the protection of human health and environment. RBCA uses a three-tier approach as defined in ASTM PS-104 "Standard Provisional Guide for Risk-Based Corrective Action" (ASTM, 1998). TEC uses computer modeling (RBCA Tool Kit, BIOSCREEN, BIOCHLOR, and Johnson & Ettinger Model) in its performance of multi-tiered RBCA.

 
UST Cleanup Fund Services

TEC Accutite has assisted many clients in getting reimbursed for costs incurred in the environmental investigations and cleanup of their fuel leak sites. In California the Cleanup Fund helps eligible owners, including government agencies and operators of petroleum underground storage tanks USTs with the following:

    • Meet federal and state requirement in demonstrating financial responsibility by providing coverage to pay for the costs of cleanup and third party liability caused by an unauthorized release of petroleum from a UST;
    • Obtain reimbursement for the costs of assessing and cleaning up unauthorized releases of petroleum from USTs; and
    • Obtain reimbursement for damages awarded to third parties, who are injured by unauthorized releases of petroleum from USTs

The coverage of cost for site assessment and remediation by the cleanup fund is up to 1.5 million dollars. TEC Accutite has helped clients and is ready to help potential eligible clients with the full process of getting the reimbursement money.

 
Phase II Subsurface Investigations

TEC Accutite has twenty years of experience in conducting subsurface investigations (Phase II) to assess soil and ground water conditions at contaminated sites. These services include installation of soil boreholes, monitoring wells, soil vapor surveys, sampling, and analysis. Analytical findings are used in risk assessment studies to determine site closure, further assessment, or remediation.

 
Hazardous Waste Management

TEC staff is qualified to provide clients with Spill Prevention, Control and Countermeasure (SPCC) Plans, and/or Hazardous Material Management Plans (HMMPs). Engineers and geologists provide sampling and characterization for the profiling, transport, disposal or treatment, of liquid and solid waste.

 
Feasibility Study

Feasibility studies focus on both technical and economic evaluation of viable remedial alternatives to comply with the most current applicable regulatory standards and site-specific cleanup levels.

 


Top News

South San Francisco, CA, May 9, 2011. TEC NV-201 (patent pending) approved by CARB for use at ORVR gasoline dispensing facilities (GDFs); a milestone for reducing operating costs at GDFs while maintaining clean air.

Read more...


Monitoring with TEC

TEC is the US distributor for Edinburgh Instruments gas sensors and monitors. Edinburgh Instruments are capable of detecting and measuring carbon dioxide, methane, carbon monoxide, and refrigerants - for your process control, personal safety, air quality, and environmental monitoring needs.
Please contact us to place an order.

TEC Utilizes NoViolation

TEC understands the importance of compliance regulations. That is why we use NoViolation.com, an online compliance tool, to track all documents related to your underground or aboveground storage tank systems.